Expect shoulder and median work to continue at various locations on I-90 from the Laurel interchange to Pinehills interchange…Expect single lane traffic with reduced speeds throughout the area.

Refurbishing operations continue on the skybridge that goes over North 29th St Street. This is causing single lane traffic between 2nd Avenue North and 3rd Avenue North…This project is scheduled to last up to 3-months.

Rimrock Road remains under major re-construction from apprx Brayton Street to Beth Drive. Poly Drive is being used as a detour…Local traffic is being permitted with a 25 mph speed limit and workers and equipment throughout the area. Use a different route if possible.

Bench Blvd in the heights just east of Main Street to Lincoln lane is now open but remains under full construction with an unpaved roadway and traffic control devices. Watch for workers and equipment throughout this area.

The traffic signal at 4th Ave North and North 28th Street is being replaced…currently, 4th Avenue traffic has the right away but must yield to all pedestrians. This project will be on going for another 2-weeks…also in this neighborhood…The far north lane on 4th Ave North between North 28th and North 29th Streets is closed due to construction of the new stockman bank building. This closure is scheduled to go through August 1st.

Look for workers and equipment around the intersection of North Frontage Road and Hwy 87 East in Lockwood. During regular working hours expect a very congested area.

Curb, gutter and sidewalk replacement is underway on Jackson Street from Vaughn Lane to King Ave East. Look for slowed traffic, workers, equipment and occasional detours. Use a different route if possible.

Highway 87 East in Lockwood from Old Hardin Road to Piccolo Lane remains closed to all westbound traffic. Eastbound traffic is being maintained.

More From 103.7 The Hawk